You don't have javascript enabled. Good luck with that.
Pencarian
12 Bangunan Liar di Sisi Kali Ciliwung Gambir di Tertibkan

12 Illegal Buildings at Ciliwung Riverbank Demolished

Dozens of permanent buildings along Ciliwung riverbank, Jalan Batu, Gambir, Central Jakarta were demolished.

Four buildings are demolished by the owners

Gambir Sub-district Head, Fauzi, admitted his side had given warning letter before controlling the buildings. Mostly the owners wanted to cooperate.

“Four buildings are demolished by the owners,” he said, Monday (11/28).

Green Belt on Jalan Sumur Bor Occupied by Illegal Buildings

According to him, those buildings were occupied by 15 families or 35 people. Three families have been relocated to Pondok Bambu flat, and the rests prefer to go to their hometown.

During the controlling, his side deployed 45 personnel of Satpol PP, Sub-dept. of Water Management, Sub-dept. of Cleanliness and PPSU, and one heavy equipment.

“The location will be used as pump house,” he closed.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1630 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye664 personFakhrizal Fakhri
  3. Jakarta Swift Response to Volcanic Ash Helps Narrow Areas with High PM10

    access_time08-09-2026 remove_red_eye464 personAldi Geri Lumban Tobing
  4. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye397 personDessy Suciati
  5. Ketapang TPS 3R Processes 13 Tons of Waste from Duri Pulo and Petojo Utara

    access_time11-09-2026 remove_red_eye370 personFolmer